Montridge Insurance ServicesAVIATION INSURANCE
Operations. Coverage. Contracts.

Aviation insurance & risk

Aircraft hull insurance

Hull review concerns physical damage to the insured aircraft. Start with the valuation basis, aircraft schedule, approved uses and loss settlement provisions.

Business jet approaching an airport against a clear sky
Photo: Alito McBean / Unsplash. Illustrative aviation photography.

HYPOTHETICAL EXAMPLE

An operational scenario

A business jet suffers substantial damage while parked during a storm. Repair cost, insured value, deductibles, salvage rights and any settlement conditions become separate parts of the analysis.

Illustrative example only; this is not a Montridge client or reported claim.

The insurance distinction

An agreed or stated value discussion must be tied to the actual form. Aircraft liability concerns third-party claims; it does not replace hull insurance. Coverage while parked, taxiing or flying depends on the selected terms and restrictions.

What to examine

Reconcile insured values with the aircraft’s configuration, equipment, financing and market evidence. Review partial versus total loss treatment, repair arrangements, geographic limits and any required notifications following modifications.

Evidence to gather

  • Aircraft schedule and valuation evidence
  • Equipment and modification list
  • Finance or lease requirements
  • Hull form, deductibles and endorsements

Questions for your review

  • What valuation basis is actually in the policy?
  • How are installed upgrades treated?
  • Which deductibles apply to the circumstances of loss?

References and review status

References support the indicated background topic. Review questions are educational analysis; no specific policy specimen has been supplied. Source checks: November 12, 2026.

A focused conversation

Start with the operation.
Then examine the insurance.

Bring your aircraft or service profile, current policies and key contracts. Identify what needs a closer review.

Request a risk review →