HYPOTHETICAL EXAMPLE
An operational scenario
A charter operator adds a managed aircraft and a contract pilot for a busy period. The management contract may be signed before the insurance schedule, approved pilot requirements and operating arrangements have been reconciled.
Illustrative example only; this is not a Montridge client or reported claim.
The insurance distinction
Part 135 is an operating framework, not a coverage form. Applicable air-carrier financial responsibility requirements do not establish that every requested contractual limit, aircraft use or insured party has been accepted by an insurer.
What to examine
Review the named insured structure, aircraft schedule, approved uses, pilot provisions, operating territory and passenger limit structure. Investigate changes in ownership, management, subcontracted lift and contracts before treating the renewal as a repeat of the prior year.
Evidence to gather
- Operating certificates and relevant specifications
- Aircraft and ownership schedules
- Pilot qualifications and training records
- Charter and aircraft-management agreements
Questions for your review
- Which entity exercises operational control for each flight?
- Has every aircraft and intended use been presented?
- Do contractual requirements exceed the current policy?
Watch the related explanation
Part 135 Charter Insurance Renewal: Coverage, Pilots and Underwriting
Select the thumbnail to load YouTube. Third-party privacy terms apply.
References and review status
- FAA Part 135 general certification requirements
Operating certification and applicable air-carrier insurance filing context - 14 CFR Part 205 air-carrier insurance
Applicable direct air carriers; not every aircraft owner
References support the indicated background topic. Review questions are educational analysis; no specific policy specimen has been supplied. Source checks: November 12, 2026.

