Montridge Insurance ServicesAVIATION INSURANCE
Operations. Coverage. Contracts.

Aviation insurance & risk

Airport premises liability

Airport premises review considers the activities and conditions controlled by the insured. Tenant operations, public areas and airside activities should be mapped separately.

Airport apron, aircraft and control tower
Photo: CK Chen / Unsplash. Illustrative aviation photography.

HYPOTHETICAL EXAMPLE

An operational scenario

A visitor is injured near a terminal while a separate incident involves a service vehicle on the apron. The relevant location, activity and parties differ even though both events occur at the airport.

Illustrative example only; this is not a Montridge client or reported claim.

The insurance distinction

Premises liability is distinct from aircraft operational liability and liability for aircraft in custody. A policy’s aviation business description, exclusions and endorsements determine which activities are accepted.

What to examine

Review leased and owned areas, public access, vehicles, contractors, special events and contractual obligations. Match each additional insured request with the actual endorsement and the relationship it is intended to address.

Evidence to gather

  • Premises diagram and activities schedule
  • Tenant and contractor agreements
  • Vehicle and equipment details
  • Policy wording and additional insured endorsements

Questions for your review

  • Which party controls the location and activity?
  • Are all airside activities described?
  • Are special events or construction evaluated separately?

References and review status

References support the indicated background topic. Review questions are educational analysis; no specific policy specimen has been supplied. Source checks: November 12, 2026.

A focused conversation

Start with the operation.
Then examine the insurance.

Bring your aircraft or service profile, current policies and key contracts. Identify what needs a closer review.

Request a risk review →