Montridge Insurance ServicesAVIATION INSURANCE
Operations. Coverage. Contracts.

Aviation insurance & risk

Ground handling company insurance

Towing, marshaling, baggage handling and servicing can expose a business to aircraft values far above the value of its own equipment. Document custody and service boundaries.

Ground crew and baggage carts on an airport apron
Photo: Brandon Griggs / Unsplash. Illustrative aviation photography.

HYPOTHETICAL EXAMPLE

An operational scenario

A ground handler moves a jet using a tug provided by another company. Damage occurs near a hangar door, raising questions about operator training, equipment condition, customer instructions and contractual responsibility.

Illustrative example only; this is not a Montridge client or reported claim.

The insurance distinction

Damage to an aircraft in custody, injury to a third party and damage to the handler’s own tug may belong under different policy sections. An airport vehicle permit does not establish coverage for airside use.

What to examine

Review the aircraft types handled, maximum values, vehicle use, service contracts and foreign object debris controls. Compare leased equipment responsibilities and training records with the insurer’s submitted description.

Evidence to gather

  • Ground handling agreements
  • Aircraft handling and value schedule
  • Tug and vehicle schedule
  • Training, inspection and incident records

Questions for your review

  • When is the aircraft considered in the handler’s custody?
  • Are borrowed or leased tugs included?
  • Do liability limits reflect a plausible multi-aircraft event?

References and review status

References support the indicated background topic. Review questions are educational analysis; no specific policy specimen has been supplied. Source checks: November 12, 2026.

A focused conversation

Start with the operation.
Then examine the insurance.

Bring your aircraft or service profile, current policies and key contracts. Identify what needs a closer review.

Request a risk review →